Floor Strategy
AI and NOC functions on 1F, dual-zone data halls on 2F, and a 3F high-density area designed for up to 60 kW per rack.
DFT TAICHUNG · BEITUN
DFT's 4 MW, 380-rack operating facility integrates high-density data halls, resilient power, large-scale chilled-water systems, multi-carrier fiber, safety systems and a 24×7 NOC.
Contact DFT ↗
DFT APPROACH
Located in Beitun, Taichung, the facility supports colocation, AI PoC, high-density retrofits and cross-region disaster recovery.
The operating foundation combines A/B rack power, modular UPS, generator backup, dual chilled-water loops, carrier-neutral connectivity, VESDA, NOVEC 1230, CCTV, access control and emergency operating procedures.
SCOPE & DELIVERY
AI and NOC functions on 1F, dual-zone data halls on 2F, and a 3F high-density area designed for up to 60 kW per rack.
A/B paths, modular UPS, precision distribution and 4 × 1 MW generators in an N+1 configuration.
A current plant comprising 2 × 800 RT and 3 × 100 RT units, with dual supply-and-return loops and phased expansion.
Multiple telecom and cable providers plus DFT-owned fiber and DCI services.
VESDA, NOVEC 1230, CCTV, access control and environmental monitoring.
NOC, facility staff and security teams provide alarm management, maintenance and EOP response.
REAL FACILITIES
























PROJECT INQUIRY
Share rack count, rack kW, bandwidth, endpoints and target go-live date.