Data Hall
Racks, aisles, overhead routes, access and environmental control.
COMPLETED AI INFRASTRUCTURE
A completed high-density AI facility integrating the data hall, busway, electrical systems, UPS, batteries, cooling, monitoring and operational handover.
Contact DFT ↗
DFT APPROACH
The project coordinated rack layout, busway, power distribution, cooling, fire protection, monitoring and service access around the H100 compute load.
The case demonstrates completed integration and site evidence. Tier III is referenced as a design standard and does not represent third-party Uptime certification.
SCOPE & DELIVERY
Racks, aisles, overhead routes, access and environmental control.
Switchgear, UPS, batteries, generators and rack distribution.
Magnetic-bearing chillers, pumps, piping and heat rejection.
Functional testing, burn-in, handover evidence and operational readiness.
REAL FACILITIES










PROJECT INQUIRY
Provide GPU type, rack density, site and deployment timing to begin an infrastructure review.